About Us Contact Us
 
Bolivar, Tennessee
Columbia, Tennessee
Loudon, Tennessee
Columbia, TN Installation

One (1) megawatt peak shaving engine driven generator installed by Atmos Power Systems and leased to UCAR Carbon Company in Columbia, Tennessee. The power plant is completely automated, which starts and stops itself depending on the facility's electrical demand. The unit provides 480 volt power to the adjacent building with excess power diverted to the UCAR substation (transformed up to 13,200 volts) satisfying other electric needs within the facility.

All preventative and routine maintenance is provided by a local industrial engine company contracted by Atmos Power Systems. Remote monitoring logs daily operations, which provides historical information for monthly billing.

Details: One megawatt diesel engine driven generators environmentally permitted to operate 1,200 hours per year.





Privacy Policy | Legal Statement | About Atmos Energy Gathering | Atmos Energy Corporation | Contact Us
Atmos Energy is engaged in regulated utility operations and complementary nonutility businesses.
© 2008 Atmos Energy Corporation All Rights Reserved